null

3/4" Nipples and Risers (Schedule 80 PVC)

Add to Cart
$0.45

Info

SKU:
P342N

Description

Heavy-Duty Durability. Precision Threaded.

The 3/4" Schedule 80 PVC Nipples and Risers are the professional choice for creating strong, rigid connections between threaded components in your system. Unlike standard white Schedule 40 PVC, these gray Schedule 80 fittings feature thicker walls to handle higher pressure ratings and physical stress. Always apply thread sealant tape to the male threads to ensure a water-tight seal.

Available in a variety of lengths—from "Close" (where threads meet) to extended risers—these nipples are essential irrigation fittings for building filter manifolds, connecting valves, or extending sprinkler heights. Their UV-resistant gray construction makes them suitable for both exposed outdoor installations and buried high-pressure mainlines.

Why Choose Schedule 80 PVC?
  • Superior Strength: Schedule 80 PVC has a thicker wall than Schedule 40, allowing it to withstand higher operating pressures and resist impact damage.
  • Universal Threads: Both ends feature 3/4" Male Pipe Threads (MPT), making them compatible with any standard 3/4" FPT valve, filter, or fitting.
  • Corrosion Resistant: Manufactured from high-quality PVC that resists rust, rot, and chemical degradation from fertilizers.
  • Versatile Application: Perfect for high-stress areas like pump discharges, valve manifolds, and main water supply lines.
Technical Specifications

Industrial grade specifications for reliable performance.

Specification Details
Product Type Nipple / Riser (Threaded Both Ends)
Thread Size 3/4" MPT x 3/4" MPT
Material Schedule 80 PVC (Gray)
Pressure Rating Exceeds Schedule 40 Standards
Standards ASTM D-1784, ASTM D-2464, NSF Approved
Manufacturer Dura
MPN (Close Nipple) 8200
MPN (3/4" x 2") 8203
MPN (3/4" x 4") 8207
How to Install: A Step-by-Step Guide

Ensure a leak-free connection with proper technique.

Step 1: Clean Threads
Wipe both the male threads of the nipple and the female threads of the receiving fitting to remove dirt or debris.

Step 2: Apply Tape
Wrap Thread Sealant Tape clockwise around the male threads. Use 3-4 wraps for a secure seal.

Step 3: Hand Tighten
Screw the nipple into the fitting by hand until it is snug. Ensure it is not cross-threaded.

Step 4: Final Tightening
Use a strap wrench or pliers to give it a final 1/4 to 1/2 turn. Do not overtighten, as this can crack the female fitting.

✔ Compatibility Check

Verify your connection types:

  • Ends: Both ends are 3/4" Male Pipe Thread (MPT).
  • Fits: 3/4" Female Pipe Thread (FPT) fittings, such as Tees, Elbows, or Ball Valves.
  • Interchangeable: Can be used with both Gray Schedule 80 and White Schedule 40 PVC fittings.
  • Note: Not for use with hose threads (GHT).

Complete Your System

Finish your heavy-duty manifold with these compatible parts:

Related Resources

Gardening

How to Start a No-Till Garden the Easy Way

May 21st 2026

No-till gardening is a gardening method in which you do not disturb the soil with machines, tillers, …
See More
Landscape

Everything You Need to Know About Sprinkler Nozzles

May 20th 2026

A healthy, thriving yard results from a smart irrigation system, and one of the most important parts …
See More
Landscape

Top 7 Ways to Enhance Your Home’s Curb Appeal This Spring with Exterior Lighting

May 19th 2026

Spring is the perfect season to refresh your home's exterior. As lawns turn lush green and daylight …
See More
Drip Irrigation

Drip Irrigation Checklist for Spring: Essential Steps for a Thriving Garden

May 18th 2026

With mid-May upon us and temperatures rising, now is the perfect time to prepare your garden for a t …
See More
View All Posts