null

Barbed Plug

Add to Cart
$1.95 - $29.75

Info

SKU:
Q_BP

Description

Secure Termination. Professional Durability.

The Dura Plastics Barbed Plug is the reliable, professional solution for permanently closing off the end of a polyethylene tubing run. Whether you are finishing a new zone or capping off a line that is no longer in use, this insert fitting ensures a leak-proof termination.

Molded from heavy-duty Schedule 40 PVC, these plugs feature sharp barbs that create a tenacious grip inside the tubing. Unlike temporary end closures, this barbed plug is designed for permanent, secure applications where accidental opening is not an option.

Why Choose Dura Plastics Barbed Plugs?
  • Permanent Seal: Provides a secure, tamper-resistant end to your irrigation lines, preventing accidental leaks or "blow-offs."
  • Heavy-Duty Construction: Made in the USA from high-quality Schedule 40 PVC, ensuring superior resistance to UV rays, chemicals, and impact.
  • Secure Grip: The multi-barb design creates a tight compression fit that resists high pressure.
  • Versatile Application: Ideal for ending mainline runs in garden beds, fields, or landscape zones where flushing is not frequently required.
  • Wide Range of Sizes: Available in sizes from 1/2" to 2" to match your specific mainline requirements.
Technical Specifications

Understanding compatibility is key. This fitting plugs the end of poly tubing.

Specification Details
Product Type Barbed Plug (Insert Fitting)
Manufacturer Dura Plastics
Connection Single Barbed Insert (Fits Inside Poly Tubing)
Dura Part Numbers (MPN) 1/2": 1449-005
3/4": 1449-007
1": 1449-010
1 1/4": 1449-012
1 1/2": 1449-015
2": 1449-020
Material Schedule 40 PVC (UV Resistant)
Operating Pressure Hose Clamps Required for pressures > 20 PSI
Origin Made in the USA
How to Install: A Step-by-Step Guide

Follow these steps to ensure a secure termination.

Step 1: Cut Tubing
Cut the end of your poly tubing squarely where you want the line to terminate. Ensure the cut is clean.

Step 2: Prepare Tubing
Pro Tip: Soften the end of the poly tubing by dipping it in warm water or letting it sit in the sun. This makes inserting the barb significantly easier.

Step 3: Insert Plug
Push the barbed plug into the open end of the poly tubing. Use a rocking motion and ensure the tubing goes over all the barbs to the stop for maximum hold.

Step 4: Secure with Clamp
Slide a hose clamp over the tubing where it overlaps the barbs. Tighten firmly with a nut driver to prevent blowouts under pressure.

✔ Compatibility Check

Check your tubing sizes:

  • Barb Side: Fits INSIDE standard Poly Tubing (Match ID sizes).
  • This fitting terminates a Poly Tubing line.
  • Pressure Warning: Barbed fittings REQUIRE hose clamps for pressures over 20 PSI to prevent leaks or disconnection.
  • It will NOT fit flat Drip Tape (use Tape End Caps instead).

Complete Your System

Ensure your installation is secure and professional with these essentials:

See It In Action

Related Resources

Drip Irrigation

How to Save Time with a Drip Irrigation System

Jan 8th 2026

Gardening is fun and rewarding, but it also demands a lot of time and effort. A beautiful, healthy g …
See More
Gardening

How to Care for Plants over Winter: Keep Your Plants Protected During Cold Months

Jan 7th 2026

Gardens and growing spaces are full of fresh growth and nature, even in winter. However, winter wind …
See More
Gardening

10 New Year’s Resolutions for Gardeners to Grow a More Productive Garden

Jan 6th 2026

A new year means fresh intentions, positive changes, and a new growing season. As we enter 2026, it' …
See More
Gardening

Top Tips for Preserving Your Garden Harvest

Jan 5th 2026

Every gardener enjoys harvesting homegrown fruits and vegetables, especially after months of plantin …
See More