null

3/4" Nipples and Risers (Schedule 80 PVC)

Add to Cart
$0.45

Info

SKU:
P34CN

Description

Heavy-Duty Durability. Precision Threaded.

The 3/4" Schedule 80 PVC Nipples and Risers are the professional choice for creating strong, rigid connections between threaded components in your system. Unlike standard white Schedule 40 PVC, these gray Schedule 80 fittings feature thicker walls to handle higher pressure ratings and physical stress. Always apply thread sealant tape to the male threads to ensure a water-tight seal.

Available in a variety of lengths—from "Close" (where threads meet) to extended risers—these nipples are essential irrigation fittings for building filter manifolds, connecting valves, or extending sprinkler heights. Their UV-resistant gray construction makes them suitable for both exposed outdoor installations and buried high-pressure mainlines.

Why Choose Schedule 80 PVC?
  • Superior Strength: Schedule 80 PVC has a thicker wall than Schedule 40, allowing it to withstand higher operating pressures and resist impact damage.
  • Universal Threads: Both ends feature 3/4" Male Pipe Threads (MPT), making them compatible with any standard 3/4" FPT valve, filter, or fitting.
  • Corrosion Resistant: Manufactured from high-quality PVC that resists rust, rot, and chemical degradation from fertilizers.
  • Versatile Application: Perfect for high-stress areas like pump discharges, valve manifolds, and main water supply lines.
Technical Specifications

Industrial grade specifications for reliable performance.

Specification Details
Product Type Nipple / Riser (Threaded Both Ends)
Thread Size 3/4" MPT x 3/4" MPT
Material Schedule 80 PVC (Gray)
Pressure Rating Exceeds Schedule 40 Standards
Standards ASTM D-1784, ASTM D-2464, NSF Approved
Manufacturer Dura
MPN (Close Nipple) 8200
MPN (3/4" x 2") 8203
MPN (3/4" x 4") 8207
How to Install: A Step-by-Step Guide

Ensure a leak-free connection with proper technique.

Step 1: Clean Threads
Wipe both the male threads of the nipple and the female threads of the receiving fitting to remove dirt or debris.

Step 2: Apply Tape
Wrap Thread Sealant Tape clockwise around the male threads. Use 3-4 wraps for a secure seal.

Step 3: Hand Tighten
Screw the nipple into the fitting by hand until it is snug. Ensure it is not cross-threaded.

Step 4: Final Tightening
Use a strap wrench or pliers to give it a final 1/4 to 1/2 turn. Do not overtighten, as this can crack the female fitting.

✔ Compatibility Check

Verify your connection types:

  • Ends: Both ends are 3/4" Male Pipe Thread (MPT).
  • Fits: 3/4" Female Pipe Thread (FPT) fittings, such as Tees, Elbows, or Ball Valves.
  • Interchangeable: Can be used with both Gray Schedule 80 and White Schedule 40 PVC fittings.
  • Note: Not for use with hose threads (GHT).

Complete Your System

Finish your heavy-duty manifold with these compatible parts:

Related Resources

Gardening

What to Plant in June: 20 Crops for a Productive Garden

Jun 9th 2026

It's not too late to get started in the garden in June. June is a prime time for a highly productive …
See More
Drip Irrigation

Efficient Gardening: Homeowner’s Guide to Drip Irrigation

Jun 8th 2026

Drip irrigation systems provide efficient, precise watering that promotes healthier plant growth. Fr …
See More
Gardening

10 Groundcovers That Suppress Weeds Naturally

Jun 4th 2026

Ground cover plants offer remarkable versatility and beauty for any landscape. These resilient, easy …
See More
Drip Irrigation

Automate Garden Watering with a Drip Irrigation Timer

Jun 3rd 2026

Drip irrigation has already transformed the way gardeners, landscapers, and farmers water their plan …
See More
View All Posts